Field H-8RequiredDate Fields

    Metro 2 Field H-8: Activity Date

    The date through which account activity in the file is reported — effectively the file's as-of date. Every Base Segment in the file should reflect balances and statuses as of this date.

    Quick Reference

    Field Number:H-8
    Position:48-55
    Length:8 characters
    Type:date
    Record:Header Record
    Required:Yes

    Validation Rules

    • Format MMDDYYYY, zero-filled
    • Must be a valid calendar date
    • Must not be a future date
    • Should be consistent with the Date of Account Information in Base Segments

    Examples

    0630202612312025

    Common Errors

    • Future activity date (see error H003)
    • Activity date that disagrees with the Base Segment as-of dates

    Tips & Best Practices

    • Use a single as-of date per cycle so you never mix reporting periods
    • Activity Date answers 'as of when is this file true?'

    Related Fields

    Other Date Fields

    Preview this field in your own Metro 2 file

    Drop a .dat or CSV file into the free in-browser viewer to see how Activity Date is encoded in a real record. Nothing is uploaded — your file stays on your device.

    Automate Field Validation

    Metro2 software automatically validates all fields against Metro 2 specifications, catching errors before submission.

    Activity Date - Metro 2 Field H-8